Embroidery Run Clock
Textile crafts / Practical workbench

The formula reference

Every output is calculated from the equations below. Results are evaluated in the order shown.

No account neededWorks in your browserEditable assumptions

Input variables

VariableMeaningUnit
stitchesStitches per designstitches
speedEffective stitching speedstitches/min
changesColor changes per designchanges
changeSeconds per color changes
handlingHandling per itemminutes
itemsItemsitems

Equations

Sewing per item · minutes

sew = stitches/speed

Total per item · minutes

each = sew+changes*change/60+handling

Whole run duration · hours

run = each*items/60

Notation

PI means π. ** means a power, sqrt means square root, and abs gives the absolute value. Trigonometric functions use radians. min and max select the smallest or largest argument.

ceil rounds upward, floor rounds downward, and round rounds to the nearest integer with halves toward positive infinity. roundup(value, step) rounds upward to the next multiple of the step; a zero step leaves the value unchanged.

Assumptions

  1. Use observed effective speed rather than the machine’s advertised maximum.
  2. Thread trims, breaks, bobbin changes and dense stitch areas create extra downtime.
  3. Multi-head production requires a different model; this estimates sequential item processing.
  4. Test sewouts are additional to the requested production quantity.

Precision and verification

The tool uses ordinary double-precision numeric arithmetic. Output is displayed to at most four decimal places; measurement precision is usually much lower. Check the worked examples, your project’s specifications, and a real sample before committing material.