Project: ____________________________________ Date: _______________
Measurements
| Input | Unit | Recorded value |
|---|---|---|
| Stitches per design | stitches | ________________ |
| Effective stitching speed | stitches/min | ________________ |
| Color changes per design | changes | ________________ |
| Seconds per color change | s | ________________ |
| Handling per item | minutes | ________________ |
| Items | items | ________________ |
Results
| Output | Unit | Recorded result |
|---|---|---|
| Sewing per item | minutes | ________________ |
| Total per item | minutes | ________________ |
| Whole run duration | hours | ________________ |
Sample check
Time the first complete item and compare sewing time separately from hooping and color changes.
What I measured or tested: __________________________________________________
What changed after the test: __________________________________________________
Final decision: ______________________________________________________________
Use your browser’s Print command to print this page or save it as a PDF. For a filled worksheet, return to the calculator and choose Print result.